Your Position: Home > Banana Screen > Xinjiang Dacheng Coal Mining 1200TPH Banana Screen Screening System

Xinjiang Dacheng Coal Mining 1200TPH Banana Screen Screening System

banana screen in open pit coal plant
Project Introduction
Dacheng Coal Mining, invested by Xinjiang Shengjiang Investment Co., LTD, issued a public tender in 2013 for its 1200tph crushing production line. The project site is located in Jimsar County north by west 100k, the administrative division is Jimsar County Santai town. The mining area is 218km away from Urumqi. There is one layer of recoverable coal seam in the mining area. The average thickness of the coal seam is 37.34m, and the thickest part is 72.46m. We provided a 2ZKD-3673 Banana Screen.
Parameter
Customer Name:Xinjiang Guanghui Energy Co., LTD
Equipment Name:Banana Screen
Equipment Model:2ZKD-3673
Handling Material:Coal
Handling Capacity:2,500t/h
Input Size: ≤50mm
Output Size: ≤25-50mm ≤25mm
Customer Feedback
The banana screen we provide to our customers is mainly to screen the materials broken by secondary crushing, which need to be screened into two kinds of materials above 25mm and below 25mm by our double-layer banana screen. After using our double-layer large banana screen, the screening efficiency is improved, the coal production is improved, and the economic efficiency is improved.
INQUIRY