Xingsheng Open-pit Coal Mine (3.0Mt/a) is located in Nao Maohu mining area, Yiwu County, Xinjiang Province. In 2022, our company provided mineral sizer, apron feeder, roller screen, roller screen, roller screen, etc. EPC project of open-pit coal mine crushing station composed of belt conveyor. Our company provides a complete set of services from program design to procurement, production, installation and commissioning, as well as technical training and later operation and maintenance. We use the Internet of Things to provide customers with remote diagnosis and smart mining to ensure the stability and safety of the overall equipment operation, to ensure that there has not been any shutdown caused by quality problems since the production. Our products and services are highly valued by our customers.
Parameter
Customer Name:Xinjiang Jiangna Mining Industry Co.,Ltd
Equipment Name:Mineral Sizer, Apron Feeder, Roller Screen, Belt Conveyor
Equipment Model:2PLF150/300, ZBWJ2500*16000, GZS2500*5, B1800*21
Handling Material:Coal
Input Size: ≤1500mm
Output Size: <300mm
Project Advantage:
1. The complete equipment of the crushing station adopts modular design, which is convenient for the transportation and installation of the equipment, and meets the requirements of the whole or separate movement of the equipment.
2. Carry out static and dynamic finite element analysis on the main steel structure of the series crushing station to ensure that the equipment is suitable for comprehensive complex conditions such as plateau, low temperature, heavy load and impact.
3. Intelligent control system is adopted to meet the needs of energy saving and efficient mining; With dust suppression system to meet the requirements of green mining; The semi-continuous mining technology of semi-mobile crushing station is adopted, which has the characteristics of low transportation cost and high transportation efficiency.
4. With a sound intelligent mine management system, it can monitor the health status of the entire life cycle of the equipment to avoid the waste of resources caused by "over maintenance" and equipment failure caused by "insufficient maintenance".
Customer Feedback
The completion and operation of the project greatly improved the production capacity, solved the problems of large crushing ratio and large raw coal particle size in the crushing process, and the whole set of large open pit coal mine, which is divided into coal feeding, crushing and screening, provided by our company, achieved both economic and environmental benefits.