Your Position:
Home > Coal Crusher Plant > Yiwu Guanghui Energy Development Co., Ltd Eastern Mining Area 1,200TPH Crushing Stations Project
Yiwu Guanghui Energy Development Co., Ltd Eastern Mining Area 1,200TPH Crushing Stations Project
Project Introduction:
The open-pit coal mine in the East 8 district of Nuomaohu Coalfield is a construction project developed by Yiwu Guanghui Energy Development Co., Ltd for the investment subject. The project plans to build 4 open-pit coal mines and 6 shaft mines, and the coal output scale reaches more than 60 million tons per year. The coal in the project is all open-pit mining. Our company finally won the EPC project of design, processing, production, transportation, installation and commissioning of the 1200t/h semi-mobile crushing station in its eastern mining area through public bidding. In its project, we provide the crushing station project consisting of the primary crusher type 2PLF120/200 and the secondary crusher type 2PLF90/300 as well as plate feeder and belt conveyor.
Equipment Specifications
Customer Name:Yiwu Guanghui Energy Development Co., Ltd
Equipment Name:Mineral Sizer, Apron Feeder, Inclined Screen, Belt Conveyor
Equipment Model:2PLF120/200, 2PLF90/300, BSJ1600*100000mm, B1400,B1200, B1400, 2YKH-3060
Handling Material:Coal
Handling Capacity:1,200tph
Input Size: ≤1300mm
Output Size:≤300mm, ≤50-150mm
Project advantage
Use hardware, electronic control double overload protection system to prevent equipment damage.
The whole process adopts 3D modeling and solidworks finite element analysis to ensure reliable quality of equipment.
The bearings of the core components adopt large clearance self-aligning roller bearings, imported bearings SKF manufacturers, mining machinery special vibration resistance against impact ability is strong, durable. Lubrication system adopts centralized automatic oil supply, low labor intensity, safe, reliable, convenient and fast.
The whole process of EPC project, to achieve one-stop service from design, production, procurement, installation and commissioning, project operation.
Customer Feedback
Yiwu Guanghui Energy Development Co., Ltd. put into operation the 1,200tph crushing project in the eastern mining area. The mineral sizer we provide for it solves the problem of its crushing ratio, improves the efficiency of coal use, and reduces the overall operating cost. The remote diagnosis system well realizes the efficient operation of the whole crushing and screening station, early warning, and effectively guarantees its efficiency and safety.
Related Recommended Cases
INQUIRY